An Occupancy Permit, also known as an Occupation Permit, is often required once the construction of a building or space has been completed. The purpose of an Occupancy Permit is to provide proof that the building structure that has been built is safe and suitable for use.
The Occupancy Permit will outline the conditions of use for the building, which should include a safety brief, and the maximum number of people it is suitable to accommodate for. Depending on your building, the building permit will specify whether an Occupancy Permit will be required or not.
In most cases, an Occupancy Permit is required for a building structure that will be used for public entertainment purposes. Building work for a new home (including units or apartments) will always require an Occupancy Permit to be issued. Examples of instances when you will require an Occupancy Permit is:
A Certificate of Final Inspection is issued for extensions or alterations to existing homes, which do not require an occupancy permit.
An Occupancy Permit can be issued when a Final Inspection has been carried out and the Building is deemed fit for occupation. These include:
We may request certificates or statements from various practitioners involved in the construction of the building to confirm that the building is suitable for occupation.
Certificates may be required from the electrician and plumber for example, to show that power is connected and the smoke alarms are operational or that water, sewer and stormwater have been connected.
If a Building Permit states that an Occupancy Permit is required for the whole of a building, a person must not occupy that building unless the relevant Building Surveyor has issued an Occupancy Permit. An Occupancy Permit is issued upon satisfactory completion of building works and where the building or space is fit for occupation.
Need more information on Occupancy Permits? – Visit our Occupancy Permit page, or request a quote today.
Please submit your contact details and specifics of your project to receive a response from one of our staff. For most quotes, please allow up to 24 hours for a response. Larger projects are typically processed within 48 hours.
If you have not received a response within that time, please do not hesitate to contact us again!
Head Office (Glen Iris)
1/27 High Street
GLEN IRIS VIC 3146
Permits
Swimming Pools
Owner Builders
Outbuildings
Resources